Recommendations*
1. Conduct risk assessment: Prior to the commencement of work, a risk assessment should be carried out to determine the potential hazards and risks that might arise during the demolition work. Control measures and safe work procedures must be established to mitigate the risks, and be communicated and implemented to ensure the safety and health of the workers involved. The key hazard in this case was the wall that destabilised during the demolition works.
2. Cordon off wall/structures to be demolished: Personnel not directly involved in the works should not be allowed in close proximity with any walls or structures that are scheduled to be demolished; Working areas should be cordoned off.
3. Use props or wire ties: Whenever the stability of the walls/structures being demolished are in doubt, props and wire ties should be used to support the structure prior to and during the demolition.
4. Deploy trained personnel: Personnel operating machinery or equipment should be properly trained and should posses appropriate certifications. Checks should be carried out by the management team to ensure that all workers and operators are properly trained and certified to carry out the works assigned to them.


No comments:
Post a Comment